Kitchen remodels
Full kitchens, from layout and walls to cabinets, counters and lighting.
- Time on site
- 8–12 weeks
- Method
- Design-build, one project lead
- What we cover
- Single-family homes and townhomes, 1980s and newer
- How long it lasts
- Cabinets and counters 20+ years with normal care
See the difference.
One open room from the kitchen to the back windows. Shoes and bags stay in the mudroom.
See the whole job: Holly Springs kitchen and mudroom
Before
AfterMost of the kitchens we build are in houses from the 1990s and 2000s: good bones, a closed-off layout and builder-grade cabinets. We start with how you cook and where people stand, then draw the room around that.
You get drawings, a 3D view and a fixed price with every line item before any demo. Your project lead runs the job from the first visit to the last punch-list item.
What's included.
- Layout drawings and a 3D view
- Permits and inspections
- Dust walls and a temporary sink
- Weekly schedule update
The day, by the clock.
- 7:00 a.m.
Crew arrives. Dust walls and floor covers checked before tools come in.
- 7:30 a.m.
Your project lead walks the job with the crew and sets the day's list.
- 12:00 p.m.
Inspections and deliveries land midday, so the afternoon stays quiet.
- 3:30 p.m.
Site swept, tools stored, water and power back on in the rooms you use.
- 4:30 p.m.
Photos of the day in your inbox. Every Friday, the full week's update.
Kitchen remodels: jobs we have done.
Where, when and how it came out. Each project page has the full story.
All projects
Holly Springs, NC · 2025Case studyHolly Springs kitchen and mudroom
- Problem
- A 2004 kitchen closed off from the family room, with nowhere to drop bags and shoes. The family of five came in through the garage into a pile.
- Result
- One open room from the kitchen to the back windows. Shoes and bags stay in the mudroom.
- Time on site: 11 weeks
- Home: 2004 two-story, 2,800 sq ft
- Scope: Kitchen, mudroom, laundry move
Kitchen remodels: what people ask.
Still have a question?
Call or send us an email.
How long will we be without a kitchen?
Most of the build, 8 to 12 weeks. On day one we set up a temporary sink and counter in another room, so you can still make coffee and wash dishes.
Can you move walls and plumbing?
Yes. If a wall carries weight, an engineer sizes the beam and we pull the permit. Moving the sink or range is part of most kitchens we build.
Do you supply the cabinets?
We order through two cabinet shops we trust, or install cabinets you buy. Either way we measure, and the fit is on us.
Get a price: Kitchen remodels.