Skip to content
Recent projects

Our work.

Each project shows the town, the year and how it came out. Open one for the problem, the approach and the photos.

  • An open kitchen with white cabinets and a long marble islandHolly Springs, NC · 2025
    Case study

    Holly Springs kitchen and mudroom

    Problem
    A 2004 kitchen closed off from the family room, with nowhere to drop bags and shoes. The family of five came in through the garage into a pile.
    Result
    One open room from the kitchen to the back windows. Shoes and bags stay in the mudroom.
    • Time on site: 11 weeks
    • Home: 2004 two-story, 2,800 sq ft
    • Scope: Kitchen, mudroom, laundry move
  • New porch framing along the side of a house, before the roof goes onCary, NC · 2026
    Screened porches and decks

    Screened porch with a gable roof

    They eat outside most nights now. The porch reads like part of the original house from the street.

    • Time on site: 5 weeks
    • Size: 14×18 ft
  • A crew raises a framed wall on the new floor of the additionApex, NC · 2025
    Home additions

    First-floor suite for a parent moving in

    She moved in the week after final inspection. The suite has its own thermostat and its own way out to the yard.

    • Time on site: 4½ months
    • Size: 420 sq ft
Free quote

Have a job like these?

Tell us about it. A person reads every request and you hear back within one business day.