Recent projects
Our work.
Each project shows the town, the year and how it came out. Open one for the problem, the approach and the photos.
Holly Springs, NC · 2025Case studyHolly Springs kitchen and mudroom
- Problem
- A 2004 kitchen closed off from the family room, with nowhere to drop bags and shoes. The family of five came in through the garage into a pile.
- Result
- One open room from the kitchen to the back windows. Shoes and bags stay in the mudroom.
- Time on site: 11 weeks
- Home: 2004 two-story, 2,800 sq ft
- Scope: Kitchen, mudroom, laundry move
Cary, NC · 2026Screened porches and decksScreened porch with a gable roof
They eat outside most nights now. The porch reads like part of the original house from the street.
- Time on site: 5 weeks
- Size: 14×18 ft
Apex, NC · 2025Home additionsFirst-floor suite for a parent moving in
She moved in the week after final inspection. The suite has its own thermostat and its own way out to the yard.
- Time on site: 4½ months
- Size: 420 sq ft
Free quote
Have a job like these?
Tell us about it. A person reads every request and you hear back within one business day.