Bathroom remodels
Primary baths and hall baths taken to the studs, waterproofed and tiled.
- Time on site
- 4–6 weeks
- Method
- Sheet membrane under all tile, flood-tested
- What we cover
- Primary baths, hall baths and powder rooms
- How long it lasts
- Tile and waterproofing 25+ years

We take bathrooms down to the studs so we can see the framing, the plumbing and any old water damage. Then we waterproof every wet wall with a sheet membrane and flood-test the shower pan before tile.
You pick the tile and fixtures with your project lead. We order them before demo, so nothing waits on a late delivery.
What's included.
- Demo and haul-away
- New plumbing and venting to code
- Shower pan flood test before tile
- Final walkthrough with a punch list
The day, by the clock.
- 7:00 a.m.
Crew arrives. The path from the door to the bath is covered.
- 8:00 a.m.
Tile setter or plumber starts; the project lead checks the day's work order.
- 1:00 p.m.
Inspections and the flood test happen midday.
- 4:00 p.m.
Dust cleaned up and the other bathroom left ready for the evening.
Bathroom remodels: what people ask.
Still have a question?
Call or send us an email.
Can we use the house while the bath is torn out?
Yes, as long as you have a second bathroom. If it is your only one, we plan the work so the toilet is back each night.
Why the flood test?
We fill the shower pan and leave it for a day before any tile goes on. If the level drops, we find out then, not after the tile is set.
Can you make the shower curbless?
Often, yes. It depends on the floor framing. We check at the first visit and tell you plainly.